1. 300 only for donors/vip. Others will be in queue .
    Dismiss Notice

CIMIC’s Leighton Asia Wins Transportation Infrastructure Contract in Singapore

Discussion in 'EDMW' started by panda, Jun 15, 2018 at 3:00 PM.

    1. There are currently no users chatting.

    You don't have the necessary permissions to use the chat.

    1. panda

      panda THE big fat panda Pioneer Generation VIP

      Messages:
      5,554
      Likes Received:
      925
      Trophy Points:
      113
      Ratings:
      +4,163
      Credits:
      53,000 (0 Banked)
      CIMIC’s Leighton Asia Wins Transportation Infrastructure Contract in Singapore

      CIMIC Group company, Leighton Asia, as lead partner in a joint venture, has been selected by Singapore’s Land Transport Authority to deliver a A$540 million ($405 million US) tunnel and infrastructure contract (N103 contract works), as part of the North-South Transportation Corridor project.

      Revenue to Leighton Asia, which is part of CIMIC Group construction company CPB Contractors, will be approximately A$380 million ($287 million US), with the project being delivered in joint venture with local Singapore contractor Yongnam Engineering & Construction.

      Construction is scheduled to commence in the second quarter of 2018 and be completed by 2026. CIMIC Group Chief Executive Officer Michael Wright said: “The award of these major infrastructure works to support the North-South Corridor project demonstrates the positive and enduring relationship that CIMIC and Leighton Asia have built with the Land Transport Authority in Singapore.

      “We are pleased to continue to contribute our innovative and cost-effective design and construction methodologies to enhance Singapore’s world-class transportation networks.”

      CPB Contractors and Leighton Asia Managing Director Juan Santamaria said: “Leighton Asia’s major project experience and diverse construction capabilities have positioned us well to capture this contract and further key infrastructure projects in Singapore’s growing market.

      “We have a strong and growing presence in Singapore, with a team committed to leveraging our local experience and international expertise to ensure the project meets the social, sustainability and economic outcomes expected by the client and local communities.”

      The N103 design and construction contract works include 640 m of twin, three-lane vehicular tunnels; the underpinning of an existing expressway flyover; a new facility building; and an entrance ramp and exit ramp.

      On completion, the North-South Corridor project will be Singapore’s first integrated transport corridor, relieving major traffic network congestion and better connecting the northern sectors of Singapore with the central city area.

      In addition to this recent award, Leighton Asia’s Singapore business is working with the Land Transport Authority to build Springleaf Station and associated rail tunnel on the Thomson-East Coast Line. This follows the team’s successful completion of the Downtown Line 3 Jalan Besar Station and tunnels.

      RELATED: CIMIC’s Leighton Asia Awarded Civil Works Project in Hong Kong
       
    2. panda

      panda THE big fat panda Pioneer Generation VIP

      Messages:
      5,554
      Likes Received:
      925
      Trophy Points:
      113
      Ratings:
      +4,163
      Credits:
      53,000 (0 Banked)
      Leaked photos show workers cutting steel bars at scandal-hit HK$97.1 ...
      www.scmp.com › News › Hong Kong › Hong Kong economy
      3 days ago - Workers in the uniforms of Leighton Contractors (Asia), the main contractor ... Bad news and scandal are piling pressure on Hong Kong's MTR.


      Hong Kong rail giant MTR Corp says subcontractor Fang Sheung ...
      www.scmp.com › News › Hong Kong › Hong Kong economy
      Jun 7, 2018 - Chow Luen-kiu, of the Hong Kong Construction Industry Employees General Union, said it would be unfair for the MTR Corp or Leighton to try ...

      MTR Corp admits workers cut corners on Hong Kong's HK$97.1 billion ...
      www.scmp.com › News › Hong Kong › Hong Kong economy
      Jun 6, 2018 - MTR Corp faces close scrutiny from Hong Kong leader Carrie Lam after ... project was Leighton Contractors (Asia), which outsourced the steel ...

      Independent probe into MTR's Sha Tin-Central rail link platform ...
      www.scmp.com › News › Hong Kong › Hong Kong economy
      6 days ago - Hong Kong MTR ... I'll do so too,” Tien said, adding that the same could be true with the rail giant's relationship with Leighton Contractors (Asia).


      GOOD LUCK SINKIES................leeMEMBER TO THANK SB70 MAJULAH SB71...............DAFT SINKIES CAN DIE, BUT DIE DIE MUST OSO leeMEMBER NO BLAME CULTURE, NO CPIB INVESTIGATION ESPECIALlee ON CHIU BEST TEAM MONEY HAVE BOUGHT GREEDY CORRUPT JIAK SAI peeApee GABRAHMENT STRUCTURAL INTEGRITY NOT AFFECTED OK ??????

      WHAHAHAHAHAHAHAHHAHHHAAAAAAA


      [​IMG]

      [​IMG]
       
    3. Zimpleman

      Zimpleman Senior Member VIP

      Messages:
      7,300
      Likes Received:
      1,354
      Trophy Points:
      113
      Ratings:
      +3,532
      Credits:
      43,386 (0 Banked)
      Is This What the LTA awards/ contracts of huge sums to companies that were QUESTIONABLE BEFORE and today at present another misfits in the deal of a few hundred of tax-payers millions? ARE THE FUCKING JIBAI PAP GOVERNMENT THIS FUCKING CORRUPT AND ALLOWED TO BE EVEN MORE CORRUPT WITHOUT ANY INTERVENTION BY THE OFFICE OF THE HIGHEST INTERGRITY AND IS THE CPIB MANNED BY BLIND PERSON WHOM ARE STUFFING THEIR EARS WITH COTTON WOOL AND PRETEND TO ACT DUMB?!?!

      WHAT LEVEL OF CORRUPTION IS LTA AND ITS CRONIES INVOLVED IN?? WHY IS THE PEOPLE WITH ZERO TOLERANCE R ARSS NOT EVEN TAKING CONCERN OR TAKE A PEEK FROM THEIR LAST HUGE LOSS OF TAX-PAYERS MONIES AMOUNTING TO 500 MILLIONS DISAPPEARING IN THE ALPHINE BAUER SAGA??
       
    4. panda

      panda THE big fat panda Pioneer Generation VIP

      Messages:
      5,554
      Likes Received:
      925
      Trophy Points:
      113
      Ratings:
      +4,163
      Credits:
      53,000 (0 Banked)
      MTR’s ties with contractor on Sha Tin-Central link under scrutiny amid corner-cutting scandal

      [​IMG]

      Hong Kong’s railway operator and the main contractor in a corner-cutting scandal that has rocked the city’s HK$97.1 billion (US$12.37 billion) Sha Tin-Central link have a close relationship that is coming under scrutiny as the saga deepens.

      The ties could explain why the MTR Corporation has not done enough as the final gatekeeper for standards, critics have charged, an accusation the operator staunchly denies.

      The MTR Corp is partnered with Leighton Contractors (Asia) and its sister company on two major Australian rail projects in Melbourne and Sydney, but the operator has dismissed suggestions the overseas venture affected how it handled the problems on Hong Kong’s most expensive railway, saying “there is absolutely no truth to it”.

      [​IMG]

      On five occasions faulty steel bars were found installed on platforms in Hung Hom station during construction for the Sha Tin-Central line. The MTR Corp neither considered reporting the matter to police, its board or the government, nor kept proper records of the defective work. One engineer called that oversight “inconceivable”.

      In a separate blunder also involving Leighton at a nearby north approach tunnel, the rail firm admitted it failed to sign papers to certify steel bar work had been carried out correctly before allowing concreting to begin. The faulty bars were discovered when staff removed a portion of concrete due to water seepage.

      Post to obtain a response, has stayed quiet over its responsibility. The contractor was tasked with building the platforms where the faulty steel bars were discovered." Leighton, despite repeated attempts by the Post to obtain a response, has stayed quiet over its responsibility. The contractor was tasked with building the platforms where the faulty steel bars were discovered.

      The MTR Corp is involved in a joint venture with Leighton and its sister company, UGL, on the Australian projects – namely a HK$26 billion contract awarded in 2014 to run Sydney’s North West Rail Link and an extended seven-year contract signed last year to operate Melbourne railways.

      Both Leighton and UGL, an engineering firm, are owned by Australia-based parent company CIMIC Group, a leading international contractor formerly known as Leighton Holdings. Both companies are involved in the Sydney project, while only UGL is partnered with the MTR Corp in Melbourne.

      On the Sha Tin-Central link, Leighton was the main contractor responsible for building the Hung Hom station floors and platforms, which are secured by 26,000 couplers that connect multiple layers of steel bars. The project plans were finalised with a HK$5.2 billion contract signed in March 2013, which also included construction of sidings for the rail link.
       
    5. stillgottheblues

      stillgottheblues Senior Member Pioneer Generation VIP

      Messages:
      5,398
      Likes Received:
      435
      Trophy Points:
      83
      Ratings:
      +1,398
      Credits:
      30,987 (0 Banked)
      AMDK company. Sinkies will luved deep deep!
       
    6. panda

      panda THE big fat panda Pioneer Generation VIP

      Messages:
      5,554
      Likes Received:
      925
      Trophy Points:
      113
      Ratings:
      +4,163
      Credits:
      53,000 (0 Banked)
      do sb70 expect the peeApee gabrahment to cum out n explain the contract award to leighton ?

      will it be another cowAbunga contractor is responsive kHawSHIT suited for sb70 consumption ?
       
    7. Satki

      Satki Senior Member Pioneer Generation

      Messages:
      8,671
      Likes Received:
      492
      Trophy Points:
      83
      Ratings:
      +1,881
      Credits:
      33,519 (388,128 Banked)
      wow

      shiat will happen

      and happen

      and happen

      just don't blame them
       
      • SONG BO SONG BO x 1
    8. panda

      panda THE big fat panda Pioneer Generation VIP

      Messages:
      5,554
      Likes Received:
      925
      Trophy Points:
      113
      Ratings:
      +4,163
      Credits:
      53,000 (0 Banked)
      yeah, jibai kHaw will tell chiu i sarpose that's LIfE
       
    9. Zimpleman

      Zimpleman Senior Member VIP

      Messages:
      7,300
      Likes Received:
      1,354
      Trophy Points:
      113
      Ratings:
      +3,532
      Credits:
      43,386 (0 Banked)
      Speaking of the JIBAI Gumama, why did he refrain from stipulating more clauses on the mudland on compensation HSR, This CORRUPT BASTARD had so much lies to spew to the resident population. and being privy to the signing of HSR and intimate details - Why did JIBAI CORRUPT BASTARD kept his words to the naked minimum, nothing like no dishonesty found, don't doubt our good intention, and what ever JIBAI nots??

      OR could this fella trying to protect his own asset in MUDDYLAND, heaviLEE tainted with CORRUPTION too similar to LTA, while being evidentLEE contract to be their spokeperson??
       
    10. panda

      panda THE big fat panda Pioneer Generation VIP

      Messages:
      5,554
      Likes Received:
      925
      Trophy Points:
      113
      Ratings:
      +4,163
      Credits:
      53,000 (0 Banked)
      “The award of these major infrastructure works to support the North-South Corridor project demonstrates the positive and enduring relationship that CIMIC and Leighton Asia have built with the Land Transport Authority in Singapore.

      does this mean that lta/ mot/ peeApee miNiTard khawAbungle can ignore that huge leighton/ mtr scandal and just trust us, we r peeApee which in their time have witnessed all kinds of corruption ?

      taking public safety seriouslee ? wahaahhaaaaaahhaaaaa like lta/ alpine bauer evaporation 500 mil taxes hard on the peeple dollars, to date no sound no sight, not even a vestige of zero tolerance for corruption r ArSEd cPIbee
       
    11. The_King

      The_King 狗王 Pioneer Generation VIP

      Messages:
      41,047
      Likes Received:
      5,572
      Trophy Points:
      113
      Ratings:
      +12,500
      Credits:
      288,044 (2,898,594 Banked)
      Alien CardboardAdvanced CardboardCandid Sabre of Trolling
    12. BBClone

      BBClone Storm Trooper Pioneer Generation VIP

      Messages:
      2,064
      Likes Received:
      185
      Trophy Points:
      63
      Ratings:
      +896
      Credits:
      8,518 (0 Banked)
      Bloody hell, these MIW really don’t care about integrity and quality, do they?

      No chance they’re unaware of the scandal.
       

    Share This Page

    1. 300 only for donors/vip. Others will be in queue .
      Dismiss Notice